Skip to main content

    Legal

    Business Continuity & Disaster Recovery Plan

    Operational Resilience Framework

    Last updated: February 2026

    1. Objective

    This plan ensures the protection and continuity of ArosaPay's critical systems during disruptions. The objectives are:

    • Protection of secured funds logic
    • Continuity of transaction processing
    • Preservation of ledger integrity
    • Restoration of critical services
    • Regulatory compliance during disruptions

    Priority Order During Disruption

    • Protect funds integrity
    • Prevent unauthorized release
    • Preserve ledger accuracy
    • Restore service
    • Resume payout

    Funds safety always overrides speed of restoration.

    2. Critical System Identification

    Tier 1 — Mission Critical

    • Transaction State Engine
    • Secured Funds Ledger
    • Release Logic
    • Payout Orchestration
    • Database Infrastructure

    Tier 2 — Operational

    • Merchant Dashboard
    • Buyer Interface
    • Reporting System

    Tier 3 — Non-Critical

    • Marketing site
    • Analytics dashboards

    3. Recovery Objectives

    MetricTarget
    RTO (Recovery Time Objective)4 hours
    RPO (Recovery Point Objective)15 minutes
    Maximum Secured Funds Release Risk0 tolerance
    Ledger Data Loss0 tolerance

    4. Incident Classification

    • Severity 1 — Critical Infrastructure Failure
    • Severity 2 — Partial Service Degradation
    • Severity 3 — Non-Core Impact
    • Severity 4 — Cosmetic

    Severity 1 Examples

    • Database corruption
    • Funds release malfunction
    • Security breach
    • PSP reconciliation mismatch

    5. Disaster Scenarios and Response

    A. Cloud Provider Outage

    Immediate actions:

    • Halt payout execution
    • Freeze release logic
    • Activate failover region
    • Verify ledger integrity before re-enabling release

    Release resumes only after reconciliation validation.

    B. Ledger Corruption Risk

    Immediate actions:

    • Suspend state transitions
    • Lock payout engine
    • Snapshot database
    • Reconcile against PSP confirmations
    • Restore from last verified checkpoint if necessary

    Manual release prohibited during investigation.

    C. PSP Outage

    Actions:

    • Suspend payout execution
    • Continue accepting secured funds if possible
    • Notify merchants
    • Resume once PSP confirms operational stability

    D. Security Breach

    Actions:

    • Isolate affected systems
    • Rotate credentials
    • Freeze release engine if funds integrity at risk
    • Conduct forensic investigation
    • Notify regulators if required

    6. Backup Strategy

    • Encrypted daily full backups
    • Incremental backups every 15 minutes
    • Stored in geographically separate region
    • Access restricted to authorized personnel

    Backups are tested quarterly.

    7. Business Continuity Operations

    If full system outage:

    • Public status page updated
    • Merchants notified
    • Dispute timelines paused
    • Inspection windows extended
    • SLA credits evaluated

    Priority: prevent wrongful release.

    8. Communication Plan

    Internal Escalation

    • Engineering
    • Compliance
    • Executive team

    External Notification

    • Enterprise merchants
    • PSP partners
    • Regulators (if applicable)
    • Customers (if required)

    Communication timeline defined by incident severity.

    9. Post-Incident Review

    Within 5 business days:

    • Root cause analysis
    • Timeline reconstruction
    • Control gap identification
    • Remediation plan
    • Board summary report

    10. Annual Testing

    BCDR testing conducted annually:

    • Failover simulation
    • Ledger recovery simulation
    • Payout freeze test
    • Incident response tabletop exercise

    Results documented and reviewed.

    Related Documentation